Connecting water
NOTE: The VAQ E operates under mains water pressure and must always be
fitted with the supplied inlet combination and pressure reducing valve.
The Nordic boiling-water tap or the Fusion tap must be installed according to
the locally applicable regulations.
The inlet combination will release drips of expansion water while the water in
the tank is heating up in order to regulate the pressure inside the tank.
Position the inlet combination as high as possible to create a sufficient height
distance between the inlet combination and the point where the waste hose
connects to the waste pipe. This is necessary to allow the expansion water to
flow away and to prevent water from backing up from the waste pipe (see the
figure at step D4).
1 Cutting through
cold water pipe
Close the main shut-off valve. Cut
through the cold water pipe at a
suitable point.
2 Fitting T-joint
Fit a T-joint (not supplied) between
the pipe sections.
3 Fitting pressure
reducing valve
Connect the pressure reducing valve
to the T-joint with a piece of copper
piping 15mm). NOTE: The pressure
reducing valve must be fitted in the
correct direction (see image).
4 Fitting the inlet
combination
Connect the inlet combination to the
pressure reducing valve. The inlet
combination can be fitted in any direc-
tion, but the grey funnel must always
be pointing straight downwards. Close
the stop valve on the inlet combina-
tion, open the main shut-off valve and
check for leaks.